SR 80 (Southern Blvd) Bridge Replacement Project

Home / Photos / March 2018 Construction Photos

March 2018 Construction Photos

The temporary bridge’s vertical lift span rises above the Intracoastal Waterway. March 2018
Cranes are mobilized to install pieces of the temporary lift span. March 2018
Counterweights are set on the temporary lift span towers. March 2018
Drainage structures are installed at the northeast corner of Flagler Drive and Southern Boulevard. March 2018
The temporary bridge tender house is put into place. March 2018
Crews prep the eastern approach leading to the temporary bridge. March 2018